PRELIMINARY — FOR BIDDING / ESTIMATING ONLY · NOT FOR CONSTRUCTION · REQUIRES INDEPENDENT PE REVIEW & SEAL
ArmorDraft
Fire-Protection Design & Estimating

AI-assisted fire-protection estimating

Bid fire-sprinkler & alarm jobs faster — preliminary layouts, hydraulics, NFPA checks, and a priced BOM.

A design-support tool that accelerates the quote. Every output is preliminary and is validated and sealed by your licensed Professional Engineer.

Hydraulics — Hazen-Williams

Friction loss (SI in, imperial out). Internal diameter, not nominal.


    

NFPA Compliance Check

Sample LH sprinkler set vs. the live NFPA-13 rule store (post-hoc backstop).


    

BOM Parity Gate

Every design node must trace to a BOM line; per-segment LF ≤2%.


    

Priced Estimate Export

Material + labor totals, with the mandatory preliminary disclaimer.